Back to all scenarios
Scenario #454
Scaling & Load
Kubernetes v1.23, IBM Cloud
Insufficient Node Resources During Scaling
Node resources were insufficient during scaling, leading to pod scheduling failures.
Find this helpful?
What Happened
Pods failed to scale up because there were not enough resources on existing nodes to accommodate them.
Diagnosis Steps
- 1Checked node resource availability and found that there were insufficient CPU or memory resources for the new pods.
- 2Horizontal scaling was triggered, but node resource limitations prevented pod scheduling.
Root Cause
Node resources were exhausted, causing pod placement to fail during scaling.
Fix/Workaround
• Increased the resource limits on existing nodes.
• Implemented Cluster Autoscaler to add more nodes when resources are insufficient.
Lessons Learned
Ensure that the cluster has sufficient resources or can scale horizontally when pod demands increase.
How to Avoid
- 1Use Cluster Autoscaler or manage node pool resources dynamically based on scaling needs.
- 2Regularly monitor resource utilization to avoid saturation during scaling events.